Prg Bad Boy Field Service Manual Manual do Utilizador Página 24

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 23
16 BAD BOY
®
SPOT LUMINAIRE FIELD SERVICE MANUAL
Group Test
This feature only available in software version 1.5
The Group Test menu allows multiple Bad Boy Spot Luminaire to be run through a configurable test sequence when
chained together via DMX512 or Ethernet. (Refer to the Bad Boy User Manual for more information about daisy-
chaining.)
To perform a group test:
Step 1. At Group Tests screen, select options to run: Pan/Tilt, Intensity, Colors, Gobos, and/or Zoom.
Step 2. Select test option:
concurrently
(all selected tests are run at once) or
sequentially
(tests are run one at a time
as each one finishes).
Step 3. Press START to begin testing. All Bad Boy luminaires connected to the main fixture (now referred to as the
"Master") will become "Slaves" and follow the test routine set on the Master in an endless loop.
Step 4. To stop the test sequence, press STOP on the Master.
While in group test, a Master can manually change certain values by using the Manual Control screen. From here, you
can adjust the levels of parameters not active in the test sequence. For example, if a test were running on gobos and
colors, you can adjust the pan and tilt to point the Master and all Slaves to a position where it will be easier see the
output of the fixtures.
Vista de página 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 114 115

Comentários a estes Manuais

Sem comentários